Ongoing Project

1.     Karnaphuli Water Supply Project

  Treatment Plant- 143 Mld Capacity and Pumping Head of 81 m
  Pipeline:

  Installation of Conveynance pipeline of 4.0 km (1200 mm dia)
  Transmission from WTP to Nasirabad reservoir of 24.0 km of 1200mm          DIP
  Transmission pipeline Nasirabad to Battali hill =6.0 km (1200mm to 1000mm)
  Distribution pipeline= 44.0 km (200mm dia to 600 mm dia)

  Nasirabad  Reservoir (26000m3) , Battali Hill Reservoir (8500 m3), Improvement of khulshi Booster pump station.

Project Cost: 202 million US$

Source of Fund: JICA ODA Loan

 

2.     Emergency Water Supply Project

  20 Deep Tubewell
  20 km Distribution Pipeline

Project Cost: 3.6 million US$

Source of Fund: Government of Bangladesh

 

3.     Chittagong Water Supply Improvement and Sanitation Project

  90 Mld Water Treatment Plant at Modunaghat
  Modunaghat WTP to Nasirabad Reservoir (45 MLD 900 dia, 12 Km.)
  Modunaghat WTP to Kalurghat Booster Station (45 MLD 900 dia, 9 Km.)
  Kalurghat Booster Station to Patenga Booster Station (25 MLD, 750 dia, 13 Km.)
  Construction & Replacement works of Patenga in-line Booster Station
  Drainage Master plan
  Pilot Septic sludge system
  Institutional & operational development and project management support

 

Project Cost: 170.0 million US$

Source of Fund: World Bank.

4.     Project for Non-Revenue Water Reduction Initiative (PANI):

  Reduction of Non-Revenue Water in Some pilot project Areas.
  Establishment of GIS mapping system in the pilot area.

 

Source of Fund: JICA Grant, GOB and CWASA